Jumpers

Jumper End Kits

There was a need for a new subsea tieback into an existing manifold which uses a unique subsea connection system.  This system utilizes a multi-bore horizontal connection system.  The main elements to the system are 2 hubs, a connector and the special running tool.  The connector is made up of a clamp and a seal plate.  The purpose of the running tool is to pull the 2 hubs together, “sandwiching” the seal plate and clamp between them.  Then, the running tool is used to torque the 2 drive screws on the clamp, which preloads the system.  Seahorse Energy worked with the operator to utilize existing customer property where possible (to reduce costs) and engineer, manufacture and test new equipment where needed in order to deliver a new jumper end kit for the subsea tieback.

Previous Next
Close
Test Caption
Test Description goes like this
Back